Labour and material norms for renovation work
A reference for anyone starting a renovation and holding a quote from a crew. It shows three things from the Russian state construction norm base: exactly what operations a job includes, how many man-hours are allotted to it, and how much material it consumes. Not a builder’s rough guess, but the federal norm base used to cost state construction projects.
How to check a job against the norms
Nine sections follow the logic of a renovation: walls, floors, ceilings, tiling, painting, windows and doors, plumbing, electrics, demolition.
Type a word from the contractor’s quote — plaster, porcelain tile, socket — and pick the matching line.
Compare the list of operations with what you are being offered. A separate charge for an operation already inside the norm is worth a question.
Give the area, length or count in the unit shown beside the field and get hours and materials for your case.
Check what your contractor promises against state norms
Source: FSNB-2022, open data of the Russian Ministry of Construction (revision of 9 July 2026). These are state norms for typical conditions — actual consumption depends on the site and on project decisions.