Labour and material norms for renovation work

A reference for anyone starting a renovation and holding a quote from a crew. It shows three things from the Russian state construction norm base: exactly what operations a job includes, how many man-hours are allotted to it, and how much material it consumes. Not a builder’s rough guess, but the federal norm base used to cost state construction projects.

How to check a job against the norms

1
Choose a section

Nine sections follow the logic of a renovation: walls, floors, ceilings, tiling, painting, windows and doors, plumbing, electrics, demolition.

2
Find your job

Type a word from the contractor’s quote — plaster, porcelain tile, socket — and pick the matching line.

3
Read the scope

Compare the list of operations with what you are being offered. A separate charge for an operation already inside the norm is worth a question.

4
Enter your volume

Give the area, length or count in the unit shown beside the field and get hours and materials for your case.

Check what your contractor promises against state norms

Source: FSNB-2022, open data of the Russian Ministry of Construction (revision of 9 July 2026). These are state norms for typical conditions — actual consumption depends on the site and on project decisions.