Renovation cost estimate from your room sizes

An online tool for estimating a renovation. It takes your room sizes and works out exactly what an eyeballed take-off gets wrong: wall area with doors and windows subtracted, floor and ceiling area, and the skirting run around the perimeter. Each job carries standard man-hours and the list of operations it contains, taken from the published construction norm base FSNB-2022 — the same reference used to price state construction. Unit prices are yours to enter: your own, or the ones written in the quote you received.

How to build the estimate

1
Describe the flat

Take a ready set of rooms or add your own: length, width, height, number of doors and windows. Areas update as you type.

2
Tick the works

Go through the sections — strip-out, walls, ceilings, floors, doors, services — and tick what is being done. Quantities fill themselves in.

3
Enter the prices

Per unit of labour and, if you need it, per unit of material. Your own prices to budget; the quoted ones to check the quote.

4
Compare hours and print

See how many working days the scope should take by the norms, then print the estimate or export it to CSV.

Work out the quantities and check the quote you were sent

Rooms

Sizes in metres. Openings are subtracted from the wall area — nobody paints or papers a doorway, yet an eyeballed take-off almost never takes them out.

Floor and ceiling
Walls minus openings
Ceiling
Skirting run
Opening sizes

A standard door is 0.9 × 2.1 m, a window 1.4 × 1.5 m. Change them if yours differ and the wall area is recalculated.

Works

Tick what you are doing. Quantities come from the room sizes and can be overridden. Unit prices are yours to enter — your own, or the ones from the contractor quote.

WorkQty Labour, per unitMaterial, per unitAmount

Loading the works catalogue…

If a job is not in the list, add your own: name, unit and price. It carries no norm, but counts in the estimate exactly like the catalogue ones.

Total

The standard hours show how long this quantity of work is meant to take. If a crew promises twice as fast, or drags on twice as long, there is something to ask about.

%
Labour
Materials
Total with contingency
Standard hours
Working days for the crew

The full set of norms lives in the repair norms reference.

Published Author: